Mon projet 2 6

Aurecon extends relationship with Rio Tinto Iron Ore Sustaining Capital teams

Img 40 12/12/25-FR-English-NL-footer

Aurecon prolonge son partenariat stratégique avec Rio Tinto Iron Ore jusqu’en 2028

02eed883 cf69 4412 a52e 4acd0c22f878Image-R.E.News©

L’histoire qui lie Aurecon et Rio Tinto Iron Ore (RTIO) s’apprête à connaître un nouveau chapitre. À partir d’octobre 2025 et jusqu’en octobre 2028, Aurecon accompagnera de nouveau les équipes du programme Sustaining Capital de RTIO, confirmant une collaboration de longue date fondée sur la confiance, la performance et une compréhension fine des enjeux du secteur minier.

Dans le cadre de ce vaste programme de maintien des actifs, Aurecon apportera son expertise sur un large éventail de projets liés à l’eau, aux infrastructures non-productives (NPI) et aux installations électriques dans l’ensemble des opérations de Rio Tinto dans la Pilbara, en Australie-Occidentale.
Parmi les prestations clés figurent :

Ingénierie et conception

Gestion et ingénierie de projets

Support à la gestion de la construction

Ingénierie sur site

Accompagnement au commissioning

Planification et ordonnancement

Support aux contrats et aux achats

Estimation des coûts

Contrôle de projet

Aurecon s’appuie sur une solide expérience auprès de Rio Tinto. Lors d’un précédent programme pluriannuel, ses équipes ont œuvré dans six mines et trois ports, livrant avec succès 500 millions AUD d’améliorations et de remplacements d’infrastructures électriques. Une démonstration tangible de leur capacité à mener des projets critiques à grande échelle et dans des environnements exigeants.

Depuis plus de vingt ans, Aurecon travaille main dans la main avec les équipes de Sustaining Capital de RTIO, édifiant au fil du temps un partenariat marqué par la constance et la performance.

Pour Ben Lambert, Managing Director d’Aurecon pour l’Australie-Occidentale et les Territoires du Nord, cette nouvelle phase de collaboration est empreinte de fierté et d’ambition :
« Après plus de deux décennies d’accompagnement, nous avons acquis une compréhension profonde des équipes, des processus et des actifs de Rio Tinto. Nous sommes impatients de poursuivre ce partenariat afin de créer toujours plus de valeur pour leurs opérations. »

Une alliance renouvelée, bâtie sur l’expérience, l’innovation et une vision commune de l’excellence opérationnelle.
NJC.© Info AURECON RIO TINTO

---------------------------------------------------------------------------------------------------------------

Img 40 12/12/25-English

Aurecon Extends Strategic Partnership with Rio Tinto Iron Ore Until 2028

02eed883 cf69 4412 a52e 4acd0c22f878Image-R.E.News©

The relationship between Aurecon and Rio Tinto Iron Ore (RTIO) is about to enter a new chapter. From October 2025 to October 2028, Aurecon will once again support the teams of RTIO’s Sustaining Capital program, reaffirming a long-standing collaboration built on trust, performance, and a deep understanding of the challenges facing the mining sector.

As part of this comprehensive asset maintenance program, Aurecon will contribute its expertise to a wide range of projects related to water, non-productive infrastructure (NPI), and electrical facilities across all of Rio Tinto’s operations in the Pilbara region of Western Australia.

Key services include:

Engineering and Design

Project Management and Engineering

Construction Management Support

On-Site Engineering

Commissioning Support

Planning and Scheduling

Contract and Procurement Support

Cost Estimation

Project Control

Aurecon has a strong track record with Rio Tinto. During a previous multi-year program, its teams worked across six mines and three ports, successfully delivering AUD 500 million worth of electrical infrastructure upgrades and replacements. This is a tangible demonstration of their ability to deliver large-scale, critical projects in demanding environments.

For over twenty years, Aurecon has worked closely with the Sustaining Capital teams at Rio Tinto, building a partnership characterized by consistency and performance.

For Ben Lambert, Managing Director of Aurecon for Western Australia and the Northern Territories, this new phase of collaboration is filled with pride and ambition:

“After more than two decades of working together, we have gained a deep understanding of Rio Tinto’s teams, processes, and assets. We look forward to continuing this partnership to create even more value for their operations.”

A renewed alliance, built on experience, innovation, and a shared vision of operational excellence.

NJC.© Info AURECON RIO TINTO

------------------------------------------------------------------------------------------------------------------

Img 40 12/12/25-NL

Aurecon verlengt strategisch partnerschap met Rio Tinto Iron Ore tot 2028

02eed883 cf69 4412 a52e 4acd0c22f878Image-R.E.News©

De relatie tussen Aurecon en Rio Tinto Iron Ore (RTIO) gaat een nieuw hoofdstuk in. Van oktober 2025 tot oktober 2028 zal Aurecon opnieuw de teams van RTIO's programma voor duurzaam kapitaalonderhoud ondersteunen. Hiermee wordt een langdurige samenwerking bevestigd, gebaseerd op vertrouwen, prestaties en een diepgaand begrip van de uitdagingen waarmee de mijnbouwsector wordt geconfronteerd.

Als onderdeel van dit uitgebreide programma voor het onderhoud van activa zal Aurecon zijn expertise inbrengen in een breed scala aan projecten met betrekking tot water, niet-productieve infrastructuur (NPI) en elektrische installaties op alle locaties van Rio Tinto in de Pilbara-regio van West-Australië.

Belangrijkste diensten zijn:

Engineering en ontwerp

Projectmanagement en engineering

Ondersteuning bij bouwmanagement

Engineering op locatie

Ondersteuning bij inbedrijfstelling

Planning en scheduling

Ondersteuning bij contracten en inkoop

Kostenraming

Projectbeheer

Aurecon heeft een sterke reputatie bij Rio Tinto. Tijdens een eerder meerjarig programma werkten de teams van Aurecon in zes mijnen en drie havens en leverden ze met succes upgrades en vervangingen van elektrische infrastructuur ter waarde van AUD 500 miljoen op. Dit is een tastbaar bewijs van hun vermogen om grootschalige, kritieke projecten in veeleisende omgevingen te realiseren.

Al meer dan twintig jaar werkt Aurecon nauw samen met de Sustaining Capital-teams van Rio Tinto en heeft een partnerschap opgebouwd dat gekenmerkt wordt door consistentie en prestaties.

Voor Ben Lambert, Managing Director van Aurecon voor West-Australië en de Noordelijke Territoria, is deze nieuwe fase van samenwerking gevuld met trots en ambitie:

“Na meer dan twintig jaar samenwerken hebben we een diepgaand inzicht gekregen in de teams, processen en activa van Rio Tinto. We kijken ernaar uit om dit partnerschap voort te zetten en nog meer waarde te creëren voor hun activiteiten.”

Een hernieuwde alliantie, gebouwd op ervaring, innovatie en een gedeelde visie op operationele excellentie.

NJC.© Info AURECON RIO TINTO

-------------------------------------------------------------------------------------------------------------

Date de dernière mise à jour : 11/12/2025

  • 3 votes. Moyenne 5 sur 5.